← all tools
// compliancePro

G99 pack (solar PV)

DNO G99 pack drafted for solar PV installs.

// what happens now

The bit that eats your evening.

G99 is eight sections of DNO paperwork you've filled out a dozen times this year, each one slightly different because every DNO wants the form their way. The customer wants the install next month; the DNO wants four weeks; you want a coffee and your evening back.

// how it works with Hint

Tell it. It does it. You sign off.

Tell Hint the inverter, array size and customer's postcode. It picks the right DNO (UK Power Networks, SSEN, Northern Powergrid, etc.), drafts the eight G99 sections to that DNO's house style, and produces a submission-ready PDF so the install date doesn't slip another month.

  1. 1Punch in the inverter and array spec.
  2. 2Hint reads the postcode and picks the right DNO.
  3. 3It drafts G99 sections 1-8 to that DNO’s house style.
  4. 4Submission-ready PDF out — install date holds.

Stop doing it the hard way.

Free to start. Open it and have a go — pay only when it's pulling its weight.

// FREE TO START · £29/MO UNLOCKS THE LOT · CANCEL ANY TIME
G99 solar PV pack for UK MCS installers — DNO-tailored in 90s